In the control area
Documentation of the post-operational phase and decommissioning in the controlled area of the Grafenrheinfeld nuclear power plant, 2017 to date
The interior of the control area at KKG is being dismantled manually piece by piece. (Contaminated) materials are being dismantled, sawn up and measured and the heart of the power plant - the reactor pressure vessel - is being dismantled. In addition, the pools in the KKG reactor room have been free of water since 2023, which creates the conditions for dismantling and packaging the reactor pressure vessel.
Let's get started together!
Feel free to contact me by e-mail or phone. I will take care of your request as quickly as possible. I look forward to hearing from you! Best regards, Johannes.
phone: +49 (0) 151 196 171 04 • mail:
Arrange an initial consultation